Sector
Bitcoin mining
We source and quote the electrical gear a mining site buys for itself: transformers new, refurbished and surplus, from one unit to project quantities, and the switchgear, generators, parts, fluids and cable that keep the site running.

Mining sites, and the sites converting to AI
You own the site, so you buy the gear.
Bitcoin miners, and the miners converting to AI and high-performance computing, own their sites and buy their own electrical gear directly, not through a hyperscaler's framework agreement.
A new large power transformer can be a multi-year wait. We source units new, refurbished and surplus, from one unit to project quantities, and the parts and fluids that keep installed transformers running. We work through established relationships with manufacturers and suppliers.
We have supplied transformer bushings to a bitcoin miner that became an AI data-center operator.
Send a bill of materials, part numbers or drawings. We quote in writing with pricing and lead time.
What we source for this sector
We source and quote.
Real example items, by system. Send anything that is not listed; the search is the same.
Transformers
- Power transformers
- Pad-mount transformers
- Distribution transformers
New, refurbished and surplus units, from one unit to project quantities. A new large power transformer can be a multi-year wait, so send the specification and we search manufacturers and second sources for the unit and for alternates, then quote what we find.
Switchgear and components
- Switchgear
- Fuses and fuseholders
- In-line disconnects
Generators
- Generators
- Generator packages
Transformer parts
- Bushings
- Arresters
- Valves
- Gaskets
- Gauges and relays
The parts that keep an installed transformer running.
Transformer fluids
- Type II mineral oil
- Natural ester fluid
Power cable and building wire
- Power cable
- Building wire
How a request works here
Four steps, in your words.
Send the bill of materials
A bill of materials, part numbers or drawings, with quantity and the date the site needs it. For a single part, a nameplate photo is enough.
We search
Manufacturer first, then distributors and second sources, and for a transformer the refurbished and surplus market alongside new.
Quote in writing
Pricing and lead time in one written quote.
Deliver to the site
Freight coordinated to the pad or the laydown yard, tracked until it lands.
Start a request for bitcoin mining.
The form opens with this sector selected. A part number, a nameplate photo or a description is enough to start.